
Surat Metro Phase I
Two corridors totalling 40.35 km and 38 stations are being built across Surat.
Status as of 31 Mar 2026
City development
Major public projects shaping the city's next chapter—without treating a proposal, tender or construction site as the same thing.
Current project records
12 projects

Two corridors totalling 40.35 km and 38 stations are being built across Surat.
Status as of 31 Mar 2026
A 4.4 km elevated extension with three stations is being procured between Saroli and the Surat high-speed rail station.
Status as of 23 Sept 2026
The Mumbai–Ahmedabad high-speed rail station at Antroli is in advanced building and track works.
Status as of 17 Mar 2026
A multi-agency redevelopment is rebuilding station, concourse and interchange facilities at Surat's principal railway station.
Status as of 11 Mar 2026
Indian Railways is redeveloping Udhna Junction as part of wider station investment in Surat.
Status as of 27 Sept 2025
SMC is constructing a new barrage downstream of the existing weir to increase raw-water storage and limit salinity intrusion.
Status as of 18 Sept 2025
A 33 km river strategy proposes flood-resilient edges, cleaner water, public access and continuous walking and cycling routes.
Status as of 8 Aug 2022
A municipal depot is planned at Kosad to support electric-bus operations.
Status as of 18 Sept 2025
SMC plans a centralised dry- and wet-waste processing plant at Umber.
Status as of 18 Sept 2025
SMC plans to augment and upgrade water-treatment capacity serving newer northern and western areas.
Status as of 18 Sept 2025

The airport expansion added a larger integrated terminal, apron capacity and a parallel taxi track.
Status as of 4 Mar 2026

A purpose-built diamond trading complex in DREAM City, inaugurated in December 2023.
Status as of 15 Jul 2026