The airport expansion added a larger integrated terminal, apron capacity and a parallel taxi track.

Overview
The integrated terminal was inaugurated in December 2023. AAI-hosted reporting recorded the parallel taxi track and apron expansion as completed by March 2026; this record concerns physical project completion, not airline schedules.
Why this status
Terminal, parallel taxi track and apron expansion components were reported complete.
Verified facts
Airport reference point
21°06′58″N, 72°44′31″E
Fixed site
Map
Marker: Surat International Airport aerodrome reference point. A point marks a fixed site, not the geographic extent of every related work.
Verified milestones
Project timeline
17 December 2023
Expanded terminal inaugurated
AAI inaugurated the new integrated terminal building.
4 March 2026
Taxi-track and apron works reported complete
AAI-hosted reporting recorded completion of the parallel taxi track and apron expansion.
Connected records
Administrative zone
South West Zone
Calculated from the fixed project point.
Surat Through Time
December 2023 · A new integrated airport terminal is inaugurated →Source transparency
Sources
Last verified 28 September 2026 · Status evidence dated 4 March 2026
- Airports Authority of IndiaNew Integrated Terminal Building of Surat International Airport · 17 December 2023
- Airports Authority of IndiaSurat airport parallel taxi track and apron expansion completion · 4 March 2026
- Airports Authority of IndiaSurat Airport aerodrome data
- Wikimedia CommonsImage: Phantom6599 · Wikimedia Commons · CC0