Tapi Riverfront Development and Rejuvenation

A 33 km river strategy proposes flood-resilient edges, cleaner water, public access and continuous walking and cycling routes.

Proposedas of 8 August 2022

Overview

SMC's published concept master plan integrates embankments, pollution control, public space and access on both banks. The source remains a planning document, so this record does not imply that the full riverfront is under construction.

Why this status

The currently available SMC project page presents the riverfront under planning and tendering, with components still requiring detailed work and statutory approvals.

Verified facts

Study reach

About 33 km from Kathore Bridge to Rundh–Bhatha

Verified milestones

Project timeline

  1. Source updated 8 August 2022

    Concept master plan remains the published basis

    SMC lists the project under planning and tendering rather than as a completed riverfront.