A 33 km river strategy proposes flood-resilient edges, cleaner water, public access and continuous walking and cycling routes.
Overview
SMC's published concept master plan integrates embankments, pollution control, public space and access on both banks. The source remains a planning document, so this record does not imply that the full riverfront is under construction.
Why this status
The currently available SMC project page presents the riverfront under planning and tendering, with components still requiring detailed work and statutory approvals.
Verified facts
Study reach
About 33 km from Kathore Bridge to Rundh–Bhatha
Verified milestones
Project timeline
Source updated 8 August 2022
Concept master plan remains the published basis
SMC lists the project under planning and tendering rather than as a completed riverfront.
Source transparency
Sources
Last verified 28 September 2026 · Status evidence dated 8 August 2022