Aapdu Surat
← Explore Surat

Bridges & infrastructure · Athwa–Adajan

Pandit Dindayal Upadhyay Bridge

A 2018 cable-stayed bridge linking Athwa and Adajan across the Tapi.

Open on map

Why visit

The bridge is one of the clearest pieces of contemporary engineering on the Tapi, with its cable-stayed span and paired pylons visible from several river approaches.

About

The bridge extends about 918 metres across the Tapi, including a 300-metre cable-stayed section with two 35-metre pylons. SMC's project record describes a 150-metre principal span and approaches connecting Athwa with Adajan. It opened in 2018 and has become a recognisable part of the modern river crossing network.

What to see & do

  • View the cable geometry from a safe public riverfront or road-side vantage rather than stopping in traffic.
  • Compare this 2018 crossing with the older Nehru Bridge to read how Surat's river connections have expanded.

Plan with current information

Visitor information

  • This is operating transport infrastructure, not a managed attraction. Use legal pedestrian routes, obey traffic restrictions and never stand in the carriageway for photographs.

Time-sensitive details last checked 6 October 2026. Recheck official notices before a special trip.

Location

Map

Open on map

Provenance

Sources

Facts and coordinates are attributed separately. Last reviewed 6 October 2026.